This guide is designed to help users complete the Plan Sets intake form. It provides additional information on the minimum content required in the form, and which images from the site survey should be included in the photo uploader section.
All the required fields and photos are necessary for an accurate plan set to be created. In the absence of any of the required fields or photos, the Plan Sets request may be rejected.
Table of Contents:
Project
Project address, AHJ, and utility information will fill automatically.
If homeowner information is filled out in the Project Overview, the fields will auto-populate. Otherwise, complete the homeowner information fields.
Contract profile will also auto-populate if configured in Contractor profile settings. Otherwise, complete the contractor profile fields.
You can also request the engineering stamps after the plan set is complete and ready for download. Learn more.
Site Model
Pitch, azimuth and array information will be taken from the Aurora model. Be sure to fill in information for each mounting plane.
All racking and attachment fields are required.
System Design
Fill in required electrical properties fields, including main service panel (MSP), main breaker, utility meter, and system interconnection information.
Storage
In the System Design tab of the plan sets request form, users can indicate if the design includes storage using the toggle.
Once toggled on, the user will be prompted to fill out the storage section to provide information to our plan sets team.
Once the information has been entered, the user will be able to review under the Electrical section of the Project Information before submitting the request.
- Tesla Powerwall 2 and Powerwall +
- Generac PWRCell
- Enphase Encharge
- Any DC-coupled battery with SolarEdge Storage-Ready equipment
- FranklinWH
- SunVault
- Sol-Ark
- Q CELLS Q.SAVE models
- LG Home8
Images and Documents
Upload any photos taken during the site survey or other related documents.
Required are listed below and examples of required photos can be seen on this page after clicking the "See required photos" link. At a minimum, please include photos of the following:
-
Main service panel
-
Main service panel label
-
Utility meter
-
PV equipment location
-
Roof
-
Rafters
-
Sub-panel (if applicable)
Review and Submit
Once all the project information has been added to the corresponding section, please review before submitting the Plan Set request.
If you need to request a revision to your Plan Set, check out this related article.